INSTALLATION AND START-UP
Complete systems and skids are manufactured by experienced personnel and assembled worldwide, including start-up and training. Complete systems or skids are fully piped, wired, pneumatically hosed and can also be supplied including automation. The production of piping at the customer's premises is just as possible as the connection of the system to the customer's supply lines.
The systems are thoroughly tested and inspected as part of the factory acceptance test (FAT). After installation and start-up, further tests can be carried out as part of the SAT. On request, the system can also be qualified (DQ, IQ, OQ).